Estimate planning risk from temperature, refrigerant, transit time, connections and handling gaps. Unknown inputs increase risk.
Enter the conditions that move this planning score. Values already saved from other tools are filled in. Unknown inputs increase risk.
Optional. Confirmed conditions lower planning risk. Unconfirmed or missing conditions do not count as safe.
Results appear once this form is complete.
The assessment scores temperature, transit duration, connections, packaging, refrigerant, documents, handling and contingency using FTE-defined weights. Enter the required conditions on this page, or reuse values already saved from other tools. Unknown values raise the dimension score and lower confidence. The result is a planning band, not a certification or carrier acceptance decision.
No. It is an FTE planning score. Product requirements, carrier acceptance, and operational readiness still need shipment-specific confirmation.
No. It only records a declared planning condition. Carrier acceptance, product requirements, route conditions, and operational readiness still need shipment-specific confirmation.
Work through the highest drivers, complete missing shipment details, keep the shipper’s explicit temperature instructions, and send the plan to FTE for an operational review.
Planning guidance
These results support shipment planning and are not a guarantee of airline acceptance, customs clearance, or product condition. Carrier, origin, destination and regulatory requirements differ — confirm final requirements with FTE operations before tender.
Last reviewed: August 18, 2026
Send your shipment plan and explicit handling instructions to FTE for confirmation.